The M62 motorway stands as a critical artery in England’s road network, stretching approximately 107 miles from Liverpool in the west to Hull in the east, while crossing the challenging Pennine hills. As the highest motorway in England, reaching an elevation of 1,221 feet at Windy Hill near junction 23, it serves millions of daily commuters, freight haulers, and tourists. However, its popularity brings persistent challenges like heavy congestion, frequent accidents, and extensive roadworks. This comprehensive guide delivers the freshest insights into current conditions, historical patterns, and strategies to minimize travel disruptions.
Current Congestion Hotspots on the M62
Traffic buildup on the M62 varies by time of day and location, with peak hours amplifying issues. As of recent reports, westbound sections near junction 25 in Kirklees District are experiencing notable slowdowns due to ongoing maintenance. Lanes 1 and 2 remain closed on the entry slip and within the junction, impacting flows until early morning on 14 April 2026. Further disruptions extend between junctions 26 and 25, where two of four lanes are affected.
- Junction 25 Westbound: All lanes closed on entry slip; expect delays until 06:00 on 14 April 2026.
- Between J26 and J25: Lanes 1 and 2 closed, reducing capacity significantly.
- Other Affected Areas: Lane 3 closures for barrier repairs and general roadworks persist in multiple spots.
Eastbound travel sees lighter but still problematic queues around major interchanges. Monitoring apps and live feeds from services like RAC and AA highlight these as recurring pain points, especially during rush hours from 7-9 AM and 4-7 PM.
Live Accident Reports and Safety Concerns
Accidents on the M62 are alarmingly common, often linked to high speeds, poor weather over the Pennines, and dense traffic volumes. Junction 27 emerges as a primary hotspot due to elevated traffic merging from the M621 towards Leeds. Historical data points to multiple vehicle pile-ups, such as the 2017 incident between junctions 22 and 23, alongside a crane fire that halted traffic between 21 and 22.
More recently, junction 20 at Thornham has recorded several collisions, attributed to sharp curves and heavy goods vehicle presence. Drivers report tailbacks extending miles during incidents, underscoring the need for vigilance. Current live updates show no major crashes as of 13 April 2026, but minor fender-benders contribute to residual delays.
| Junction | Common Incident Type | Recent Impact |
|---|---|---|
| J27 | Multi-vehicle collisions | High volume delays |
| J20 (Thornham) | Single-vehicle accidents | Frequent lane closures |
| J22-J23 | Pile-ups in poor visibility | Historical full closures |
Ongoing and Planned Roadworks
Roadworks dominate M62 disruptions, with maintenance schedules designed to upgrade infrastructure for smart motorway capabilities. In Kirklees, multiple schemes around J25 involve lane reductions for resurfacing and barrier fixes, active until October 2026 in some cases. One of four lanes at certain points remains closed until 21:00 on 10 October 2026.
Looking ahead, legacy projects like the J20-M60 smart motorway upgrade, though initiated years ago, influence current layouts with occasional overnight and weekend closures. Junction 29, intersecting the M1, awaits major improvements post-2021 to alleviate chronic queues. Junction 26 enhancements aim to streamline Bradford-Leeds travel, targeting queue reductions.
- Short-term (April 2026): J25 full entry closure; multi-lane reductions nearby.
- Medium-term: Barrier repairs through summer.
- Long-term: Smart upgrades at J20 and interchanges by late 2020s.
Notorious Junctions and Interchange Challenges
The Worsley Interchange, where M62 meets M60, ranks as the most congested spot, funneling traffic towards Manchester city center. Peak-time backups stretch for miles, exacerbated by merging lanes and high HGV volumes.
Other critical points include:
- Junction 25-26: Frequent works and Pennine gradient challenges.
- J29 (M1 crossover): National route convergence causes bottlenecks.
- J20-21: Proximity to urban sprawl and accident-prone sections.
Hauliers note these as prime delay zones, with live feeds essential for rerouting freight.
Essential Tools and Apps for M62 Travelers
Staying ahead requires reliable resources. National Highways’ Traffic England portal offers real-time alerts, while RAC and AA Roadwatch provide phone updates (e.g., 84322 for AA).
- Live Feeds: Trafficdelays.co.uk for M62-specific cams and reports.
- Route Planners: Integrate RAC or AA tools to predict ETAs accounting for works.
- Mobile Alerts: Apps push notifications for accidents and closures.
Pro tip: Enable voice-activated updates to keep eyes on the road.
Driver Tips to Beat M62 Delays
Proactive planning transforms stressful drives into smooth trips. Check conditions 30 minutes before departure, favoring off-peak travel (post-9 AM or before 4 PM). For freight operators, schedule around known closures like J25 overnight works.
- Monitor weather over Pennines—fog and wind intensify hazards.
- Use alternative A-roads like A628 for J22-J23 shortcuts.
- Maintain vehicle readiness: tires, brakes critical for inclines.
- Join congestion-busting services for dynamic routing.
Recent stats show prepared drivers save up to 45 minutes daily on busy stretches.
Future Improvements and Smart Motorway Rollout
National Highways invests heavily in M62 resilience. Smart motorway expansions at J20 add variable speed cams and extra running lanes, reducing collision risks by 20-30% based on similar projects. J26 and J29 upgrades promise capacity boosts, easing Leeds-Bradford chokepoints.
By 2026-2028, full digital integration could include AI-predicted delays, benefiting 50 million annual users.
Frequently Asked Questions (FAQs)
What causes the most delays on the M62?
Roadworks, peak-hour congestion at interchanges like Worsley, and Pennine weather are top culprits.
Are there current closures on the M62 westbound?
Yes, J25 entry slip fully closed until 06:00 on 14 April 2026; multiple lane reductions nearby.
How high is the M62’s highest point?
1,221 feet at Windy Hill near J23, making it England’s loftiest motorway.
Best apps for M62 traffic?
RAC Route Planner, AA Roadwatch, and Traffic England for live cams and alerts.
When do J25 roadworks end?
Core disruptions until 14 April 2026; some extend to October 2026.
This guide equips you with actionable intel for confident M62 navigation. Bookmark for regular updates as conditions evolve rapidly.
References
- Today’s M62 Traffic Delays — Trafficdelays.co.uk. 2026-04-13. https://www.trafficdelays.co.uk/m62-traffic-delays/
- Latest live M62 traffic news — Auto Express. 2018-08-13. https://www.autoexpress.co.uk/car-news/103357/latest-live-m62-traffic-news
- M62 Traffic News, Updates & Travel Information — RAC. Undated (Accessed 2026). https://www.rac.co.uk/route-planner/traffic-news/m62/
- M62 Traffic Reports — UK Haulier. Undated (Accessed 2026). https://www.ukhaulier.co.uk/traffic-information-reports/m62-traffic-reports/
- Traffic news for M62 — The AA. Undated (Accessed 2026). https://www.theaa.com/route-planner/traffic-news/m62
- Traffic Alerts — National Highways (Traffic England). Undated (Accessed 2026). https://www.trafficengland.com/traffic-alerts

